LAUNCH SYSTEMS Col. John Keesee 5 September 2003 Outline ? Launch systems characteristics ? Launch systems selection process ? Spacecraft design envelope & environments. Lesson Objectives ? Each student will ? Understand launch system characteristics, sizing and trade-offs. ? Estimate launch system sizes, staging requirements. ? Be able to select appropriate launch system for a given mission from available systems. ? Be able to estimate spacecraft requirements driven by launch vehicle induced environments. ? Determine costs of launch systems. Rocket Basics Thrust Specific impulse where K depends on J and the engine pressure ratio )( f  p e p e A e V e mF  M c T KIsp gm F Isp {  m e V e P e A e f p Fuel in Oxidizer in Thrust p c Throat Rocket Equation Where is the mass ratio (Assumes zero losses due to drag and gravity) tm o M veh Mg veh M Ispm veh M F a    'V adt Isp g 3 dm dt dt M o  dm dt t t o t f 3 ? ? 1 · ¨ ¨ ? § ? ? ? ? ? ? ? 1 · ¨ ¨ ¨ ¨ ¨ ¨ ¨ ? § ? ? ? ? ? ? ? 1 · ¨ ¨ ¨ ¨ ¨ ¨ ¨ ? §  ' RnIspg f M o M nIspg propellant M o M o M nIspgV """ R M o M f Rocket Equation (Cont.) M p M f e 'V Isp g § ? ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ ¨ · 1 ? ? ? ? ? ? ? ? ? 1 a ? ? ? ? ? ? ? ? o ? ? ? ? ? ? ? ? M o 1e 'V/Isp g § ? ¨ ¨ ¨ ¨ ¨ ¨ · 1 ? ? ? ? ? ? a ? ? ? ? ? ? o ? ? ? ? ? ? M p = mass of propellant M o = initial mass M f = final mass 'V = vehicle velocity change M veh = vehicle mass Staging ? Near burnout, rocket acceleration is diminished because payload mass includes entire launch systems structure. ? Staging removes lower stage structural weight M oi = initial mass of rocket including all upper stages and payload. M fi = final mass after stage has burned before separation. i = stage number 'V = ?'V i  'V i g Isp "n M oi M f i § ? ¨ ¨ ¨ ¨ · 1 ? ? ? ? Staging (Cont.) O = payload fraction = or M payload i = mass of payload plus all upper stages Structure fraction M si = mass structure for stage i M pi = mass propellant for stage i M payload M o O i Mpayload m oi i O 3 i 1 n O i H si M si M oi M si M pi M si M payload i Launch Vehicle Forces W L D V x z cp T I D Flight path angle Angle of attack ax g T W sin ID § ? ¨ ¨ · 1 ? ?  D W cos D § ? ¨ · 1 ? L W sin D § ? ¨ · 1 ? a ? ? ? ? ? o ? ? ? ? ? az g cos ID § ? ¨ ¨ · 1 ? ?  D W sinD L W cos D a ? ? ? ? ? o ? ? ? ? ? Launch System Selection Process ? Mission needs and objective ? Mission requirements – Altitude – Inclination – Right ascension of ascending node (RAAN) – Payload dimensions ? Launch system performance, availability, cost, reliability ? Fairings ? Upperstage Example Launch Systems Launch System Upper Stage LEO (kg) GTO (kg) GEO (kg) Polar (kg) Atlas IIAS Centaur 2A 8640 3606 1050 7300 Delta II 7920/25 PAM-D 5089 1840 910 3890 Pegasus XL 460 345 Shuttle - IUS 24,400 5900 2360 Taurus Star 37 1400 450 1060 Titan IV - Centaur 8620 4540 14,110 Example Orbit Transfer Vehicles Characteristics PAM-D IUS Centaur Length (m) 2.04 5.2 9.0 Diameter (m) 1.25 2.9 4.3 Mass (kg) 2180 14,865 18,800 Thrust (N) 66,440 200,000 147,000 Isp 292.6 292.9 442 Structure mass 180 1255 2100 Propellant mass 2000 9710 16,700 Airborne support equipment mass 1140 3350 4310 Launch Sites Criteria ? Minimum inclination ? Launch azimuth ? Weather Orbital motion To sun Earth rotation US Launch Sites and Launch Systems ? Western range (Vandenberg AFB): – LMMS Titan II, IV-B, Athena – Boeing Delta II, III, EELV – OSC Taurus, Minotaur, Pegasus ? Equatorial launch site: – Boeing SeaLaunch ? Alaska Spaceport – OSC Minotaur US Launch Sites and Launch Systems (continued) ? Eastern Range (Cape Canaveral Air Station, Kennedy Space Center): – STS – LMMS Titan IV; Atlas II, IIA, IIAS; EELV – Boeing Delta II, III, EELV – Orbital Pegasus XL, (Taurus, Minotaur) – Coleman/TRW/IAI Shavit ? Wallops Island – Pegasus XL, Minotaur Typical Launch Vehicle Integration Tasks ? Mission Orbit Planning – Effect of launch delays, launch window definition ? Launch vehicle and spacecraft performance analyses – LV performance variations vs mission impacts ? Defining, implementing mission unique requirements – Ground processing, ground testing – Launch vehicle interfaces - power, command, telemetry, etc. – Critical s/c commands: self-generated, booster provided, backup timers? ? Flight safety systems - range destruct protocols: installation and test of range destruct packages ? Developing multi-agency day-of-launch launch ops procedures – Example: Go/No-Go limits Launch Services - Scheduling ? LMMS Atlas Commercial template – @ 36 months, select a 3 month window – @ 12 months, select a 30 day slot – @ 6 months, select a launch day ? STS templates: – 36+ months for a Primary payload – 24 months minimum for secondary payloads Payload Integration ? Fairing size and shape ? Maximum accelerations ? Vibration frequencies and magnitudes ? Acoustic frequencies and magnitudes ? Temperature extremes ? Air cleanliness ? Orbital insertion accuracy ? Interfaces to launch site and vehicle Ground handling, ground and airborne transportation, and launch environment may be more severe than space operating environment Fairings ? Protection from aerodynamic loading ? Diameter and length constraint ? Acoustic environment ? Jettison Altitude Structural & Electrical Interface ? Physical support adaptors ? Separation/deployment system ? Kick motor/Spin tables ? Electrical interface ? Access – Physical – Electrical – Optical – Radio frequency Payload Environments ?Thermal – Pre-launch – Ascent fairing radiant – Aero-heating (Free molecular heating) ? Electromagnetic ? Contamination ?Venting ? Acceleration ? Vibration ? Acoustics ?Shock Acceleration Load Factors Lift off Max Airloads Stage 1 shutdown Stage 2 shutdown Vehicle Axial Later al Axial Lateral Axial Later al Axial Later al Titan 34D/IUS steady Dynamic +1.5 +1.5 + 5.0 +2.0 + 1.0 + 2.5 0 - +4.5 + 4.0 + 2.0 0 – +2.5 + 4.0 + 2.0 Atlas II steady dynamic +1.3 +1.5 +1.0 +2.2 + 0.3 +0.4 + 1.2 +5.5 + 0.5 + 0.5 +4.0 + 2.0 0.5 Delta steady dynamic +2.4 1.0 2 to 3 +6.0 Shuttle IUS steady Dynamic +3.2 +3.5 +2.5 +3.4 +1.1 to 3.2 +0.25 to –0.59 +3.2 +0.59 Vibration Environments ? Caused by – Launch system propulsive dynamic acceleration – Unsteady aerodynamic effects – Acoustic pressure from engines – Amplified mechanical response of vehicle structure ? Includes ground and airborne transportation ? Yields structural stiffness requirement on payload and adaptor/interface. Shock Loads Caused by pyrotechnic devices used to separate from launch. Staging, engine starts and shut down. Acoustic Environments ? Caused by – Reflected sound energy from launch pad structures and facilities. – Maximum dynamic pressure (max q) aerodynamics. ? Affected by fairing design Injection Accuracy ? Final stage guidance and propulsion performance determines injection accuracy. – Apogee, perigee, inclination – Payload’s Attitude Determination and Control System must capture and correct linear and rotational tip-off rates, and injection errors. Payload Integration Procedures ? Mating spacecraft to launch vehicle. ? Spin tests. ? Propellant loading. ? Pre-launch test of all subsystems. Payload Processing ? Receiving inspection ? Payload & ground support equipment ? Installing hardware (batteries, guidance systems) ? Pressure checks ? Communication and payload functional test Launch System Cost Estimate ? Determined from supplier. ? Should include integration and check out costs, launch support systems and launch integration costs. ? Small payloads may ride as a secondary payload. ? Example launch system costs. References – Launch system user handbooks. – Lockheed Martin, Boeing, Orbital, etc. (or www) – AIAA Launch Vehicle Summary (in Library) – International Space Industry Report – Reducing Space Mission Costs. Wertz and Larson